EO 14057 Compliance Checklist

EO 14057 Compliance Checklist

A practical checklist for federal facility managers implementing Executive Order 14057 decarbonization requirements with window film solutions.

Save this page as PDF: Use your browser's Print function (Ctrl+P / Cmd+P) and select "Save as PDF" to create a downloadable checklist.

Pre-Implementation Checklist

✓TaskDetails
☐Review EO 14057 requirementsUnderstand net-zero, emissions reduction, and building envelope mandates
☐Identify facility energy baselineDocument current EUI (Energy Use Intensity) and HVAC costs
☐Assess window inventoryCatalog all windows: type, age, orientation, condition, square footage
☐Prioritize highest-impact windowsSouth/west-facing, single-pane, highest solar heat gain
☐Determine compliance timeline2032 (50% reduction) and 2045 (net-zero) targets
☐Allocate budgetEstimate $5–$15 per sq ft for film vs. $50–$100+ for replacement

Product Selection Checklist

✓Climate ZoneRecommended ProductPrimary Benefit
☐Cooling-dominated (South)TrueVue or Silver HCMaximum solar heat rejection
☐Mixed climate (Mid-Atlantic)Ecolux Low-EYear-round insulation
☐Heating-dominated (North)Ecolux Low-EWinter heat retention
☐Security + energy neededArmorcoat Premier PlusDual safety + solar control

Procurement Checklist

✓TaskDetails
☐Contact The Window Place USApwf.estimates@gmail.com | (866) 274-2769
☐Request quoteInclude: product type, quantity, delivery address, compliance needs
☐Verify SAM registrationCAGE: 52MH9 — Active SAM registration
☐Select procurement methodP-Card (under $10K) or Purchase Order
☐Obtain technical documentationData sheets, NFRC certs, compliance statements
☐Place orderReference CAGE: 52MH9 on all procurement documents

Implementation Checklist

✓TaskTimeline
☐Receive and inspect shipment3–5 business days after order
☐Coordinate installationSchedule with certified installer
☐Document pre-installation energy useBefore installation begins
☐Complete installationTypically 1–2 weeks for standard facility
☐Allow curing period30–60 days for full performance
☐Measure post-installation energy use30–90 days after installation
☐Report energy savingsInclude in agency sustainability scorecard
☐Maintain warranty documentationFile manufacturer warranty for records